Skip to main content

Actions/Options Bar

Every control in a project's Actions/Options bar: importing and exporting files, joining or splitting work units, translating, generating logfiles, and filtering or customizing the work unit table.

The Actions/Options bar sits directly above the work unit table on a project's Overview tab. It's where you import and export files, join or split work units, run bulk actions like translating or generating a logfile, and customize or filter the table itself.
​

💡 Who is this for? This guide is for Project Managers and Account Admins who need to import, export, translate, and manage a project's work units within the wxrks platform.


The bar at a glance

Seven controls sit in this bar: Import/Export, Join in Editor, Split file, Upload file, Actions, Columns, and Filters. Once a project starts auto-translating, a Pre-translation status also appears just above the bar, next to the project's Details.

Work unit toolbar on a Draft project's Overview tab, with Import/Export, Join in Editor, Split file, Upload file, Actions, Columns, and Filters each outlined in red

1. Import/Export

The Import/Export dropdown has three sections: Export, Import, and Work Package.

Import/Export dropdown open and outlined in red, showing the Export formats (XLIFF, XLSX, Loc-kit, Translated Files, Source Files) with Whole project at workflow and Selected Work Units, the Import section with Bulk import zip, and the Work Package section

1.1 Export

Pick a format, then a scope:

  • Source Files downloads the project's original files, exactly as uploaded.

  • Translated Files downloads the current translated version of each file.

  • XLIFF and XLSX download bilingual working files in that format — useful when you need to translate or review outside wxrks. See How to Export/Import XLIFF files from/to wxrks for the full round-trip: exporting, working in another CAT tool, and importing the result back.

  • Loc-kit (others types) bundles multiple formats together in one download, including a TMX file. That TMX only contains segments pre-translated with your TM — it isn't a full export of the TM itself.

Once you've picked a format, choose the scope: Whole project at workflow exports every file at a workflow step you pick, and Selected Work Units exports only the rows you've checked in the table (they must all share the same workflow step).

While wxrks prepares your translated files

wxrks rebuilds each translated file before downloading it. For large files, such as a big multilingual .xlsx, this can take several minutes. When you confirm a Translated Files download, the download window closes and a We're preparing your file notice appears. If wxrks found tag mismatches, the notice appears after you choose to proceed. The same notice appears when you use Download Translated Files in the Project Actions menu (⋮) at the top right of the project.

Project overview after confirming a Translated Files download. A red box marks the notice at the bottom right: We're preparing your file. The download will start automatically. Don't close this tab until it does.

  • Keep the tab open. The download starts on its own when the file is ready, and the notice changes to Download started. If you try to close or reload the tab before that, your browser asks you to confirm, because leaving cancels the automatic download. You can move to other pages of wxrks in the same tab: the notice follows you.

  • Several files: the notice shows how many are ready, for example 2 of 5 files ready.

  • Closing the notice while the file is still being prepared asks for confirmation. If you close it, the download won't start on its own.

  • If something goes wrong:

    • We couldn't prepare your file: click Try again to start over.

    • This is taking longer than expected (after 30 minutes) or We couldn't check the status of your file: click Check again. wxrks keeps checking the same file, so the preparation does not restart.

ℹ️ Note: this notice applies to Translated Files only. Source Files downloads keep their progress inside the download window, and downloading a single work unit's file works as before.


1.2 Import

Bulk import zip uploads several XLIFF or XLSX files into wxrks at once — compress them into a single .ZIP first. You can choose whether imported segments should be automatically confirmed as they come in. See How to Export/Import XLIFF files from/to wxrks for what confirming on import does to Translation Memory and downstream workflow steps.


1.3 Work Package

A Work Package sends a project — including its current segment confirmations and a copy of its Translation Memory and Glossary — to a project in a different wxrks account. Send Work Package for selected work units sends only the checked rows; Send Work Package for all project work units sends everything remaining. Both options need an accepted connection with the destination account first, and only work once the project is Approved. See Send Projects Between wxrks Accounts with Work Packages for setting up that connection and the full sending/receiving/delivery flow.


2. Join in Editor

Select two or more work units that share the same target language and workflow step, then click Join in Editor to open all of them together in the wxrks Editor in one session, instead of switching between files one at a time.

Two work units with the same target language and workflow step selected and outlined in red, with the Join in Editor button, now showing a count of 2, outlined in red

3. Split file

Select a single work unit and click Split file to divide its segments into smaller parts — useful for a large file you want to assign to more than one vendor, or track as independent pieces. This button only appears while the project is in Draft or Pending status. The full walkthrough — including how the parts behave afterward — lives in Split a Work Unit into Multiple Parts.


4. Upload file

Upload file creates a new work unit in the project. A 3-step modal walks you through it: pick the target language(s), choose the workflow the new file should go through (it can differ from the project's other files), then select the file(s) to upload — more than one file can be selected here, but they'll all use the target language(s) and workflow you just picked.

Upload file modal at step 1 of 3, showing the Target Languages field with French (France) and Portuguese (Brazil) selected, plus Cancel and Next buttons

⚠️ This button only appears while the project is in Draft status (or is a continuous project).


5. Actions

The Actions dropdown groups four bulk actions. Each of the first three lets you choose Whole project at workflow (act on every work unit at a workflow step) or Selected Work Units (act only on the rows you've checked).

Actions dropdown open with two work units selected; the Translate, Copy source to target where empty, and Logfile section headers and the Delete option are outlined in red

5.1 Translate

Auto-translates the target work units using the project's Translation Settings — whichever of Context Sensitive, Machine Translation, and Translation Memory are enabled there. This is the same process that runs automatically right after a project is approved (see Pre-translation progress bar below); running it manually from here is how you re-translate after fixing a setting, updating your TM, or adding new work units later.

5.2 Copy source to target where empty

Fills every still-empty target segment with its source content, unchanged. This is mainly useful for language pairs that are identical or very close (for example Portuguese (Brazil) and Portuguese (Portugal)), where large parts of the source can stand in as a starting translation.

5.3 Logfile

Creates a new Logfile — wxrks' word/character/segment analysis, used for quotes and vendor payments. Whole Project always creates a pre-analysis logfile for every work unit; Selected Work Units opens a modal where you name the logfile, choose Pre-analysis or Post-analysis, and set a few counting options.

Create Logfile modal for two selected work units, with the Logfile type field (Pre-analysis) and the Count Words From options (Original (Source), Translated (Target)) outlined in red

The Count Words From choice (Original Source, or Translated Target) matters most once a project has already been pre-translated — see Calculating Costs and Vendor Payments from Target Content for when and why to use it. For what every other field on this modal means, and how to read the logfile you end up with, see All about Logfiles.

5.4 Delete

Permanently deletes the currently selected work units. wxrks asks you to type yes to confirm before it proceeds, and warns that the deletion could affect existing logfiles for the project — a logfile generated before the deletion will still include the word counts for the work units you're about to remove. There's no way to undo this once confirmed.

5.5 Confirm All Segments

Confirms every non-empty segment of the selected work units at once, without opening each task in the Editor. Use it when a project's pre-translation is ready to go and nobody needs to review it segment by segment.

  1. In the work unit table, select the work units to confirm. On the Overview tab a work unit is included whole; on the Tasks tab only the selected tasks are included.

  2. Click Actions and, under Confirm All Segments, click Selected Work Units. The number next to it shows how many items you selected; the item is disabled until you select at least one.

Project Actions menu with four work units selected: Confirm All Segments > Selected Work Units (step 2) and Clear All Segments > Selected Work Units (step 3) are highlighted, each showing 4

  1. Choose whether to also save the confirmed segments in the translation memory with Also save in Translation Memory the segments confirmed through this operation. It is selected by default.

  2. Click Yes.

Confirm All window for 4 selected items: 2 items are skipped because they are waiting for the previous step, the Also save in Translation Memory option (step 3) and the Yes button (step 4) are highlighted

⚠️ Warning: All non-empty segments are confirmed, even the ones with glossary or tag mismatches. Check the QA issues first if the project has strict terminology.

5.6 Clear All Segments

Empties the target text of the selected work units at once, for example when a pre-translation is not worth editing. It works like Clear all in the Editor, for many tasks together; see How to clear the translations of a task.

  1. Select the work units, click Actions and, under Clear All Segments, click Selected Work Units.

  2. The Clear All Segments window adds up, across the selected items, how many segments will be cleared and how many are kept because they are confirmed or locked. By default only unconfirmed, unlocked segments are cleared; an option to clear the confirmed ones too applies only to items whose next workflow step has not started.

  3. Click Clear to confirm. The button shows the total, for example Clear 6 segments.

Clear All Segments window for 4 selected items: 2 items are skipped because they are waiting for the previous step, the totals read 6 will be cleared, 0 confirmed kept and 0 locked kept, and the Clear 6 segments button is highlighted

Clearing cannot be undone. The previous text stays in each segment's history, and translation memory, word counts and costs do not change. Close the selected tasks in the Editor before you run it, or an open Editor may save the old text back.

How both actions run

  • They run in the background. A message says the operation started, and another one tells you when it finishes, for example Segments confirmed in 2 items. Skipped: 2.

  • Some items are skipped, and the window lists them before you confirm:

  • Tasks waiting for the previous workflow step to be delivered, for example a Review whose Translation is still open.

  • Delivered tasks, unless you have the permission to edit delivered tasks; in that case the window warns that they will be changed too.

  • Invoiced tasks, always.

  • Permissions: the sections only appear for users with Confirm All Segments (In Editor) or Clear Translations, the same permissions the Editor uses. Clear Translations is on by default for Account Admins and Project Managers.


6. Pre-translation progress bar

If at least one Auto Translate From source is enabled in the project's Translation Settings, wxrks automatically pre-translates the project's empty segments right after it's approved — this is the same underlying process as clicking Translate above, just triggered by approval instead of a manual click.

It shows up as Pre-translation just above the toolbar, next to the project's Details: a progress bar while it's running, then a count of finished files (for example 6/6), with any failures or warnings flagged. Clicking it opens Latest pre-translation runs, a per-file list showing each file's status (Starting, Started, Completed, Completed with warning, or Failed), its target locale, and when it started. If a file shows an error, you can re-run it from the Translate action above — for the whole project or just that work unit.

Latest pre-translation runs modal showing 6 Completed, with the Status column and the Target Locale and Creation Date columns outlined in red for each of the six files

7. Columns

Click Columns to choose which columns the work unit table shows, and in what order. Toggle any column off to hide it, or drag it by the handle on the left to reorder it. The available columns are File, Created At, Language Pair, Workflow, Status, Progress, Assignee, Due Date, and Delivery Date.

Visible columns panel open and outlined in red, listing File, Created At, Language Pair, Workflow, Status, Progress, Assignee, Due Date, and Delivery Date, each with a checkbox and a drag handle

8. Filters

Click Filters to narrow the work unit table down by one or more categories, then click Apply Filters to run them:

  • Targets: one or more target languages.

  • Workflows: one or more workflow steps.

  • Files: a full or partial file name.

  • Created At, Due Date, Delivery Date: a date range for when the work unit was created, or its due/delivery date.

  • Assigned to: search for the vendor a work unit's tasks are assigned to.

  • Content: a word or sentence to search for, in the source and/or target language you specify.

Filter by panel open, listing Targets, Workflows, Files, Created At, and Assigned to, with the Apply Filters button at the bottom

⚠️ You must keep at least one item selected under Targets and Workflows when filtering.


Related articles

Did this answer your question?